High Speed Door operation manual

2018-06-09

The first, High Speed Door produced overview.

1, model: hf-001;

2, size: actual scale;
3, curtain: France imported 0.8mm high density polyester fiber fabric. Integral type curtain, a transparent window can be added in the middle, and a wind bar can be added in the middle to increase the wind resistance;
4, door frame materials and specifications: 6.0mm high quality aluminum alloy rails, specifications: 140mm * 90mm * 6mm;
5. Roll-up method: The upper roller rolls up the curtain, and windproof nodes are hidden on both sides of the cabinet to increase wind resistance;
6, security devices: infrared security photoelectric. Airbag (resistance bounce) automatic derailment function;
7, the control unit: using (Danfoss Denmark HLP Heilipu) external high-performance upgrade Control Box, built-in vector control mode, high control accuracy; Heffere servo motor, power supply 220V, power 0.75kw/1400 rpm / S , carrying large loads S4 type;
8, the average speed: opening and closing speed 0.5-1.0m / s (adjustable);
9. Power failure emergency device: manual rocker for power failure, which can easily open or close the roll door;
10, quick roll door basic configuration: double-sided button, single-sided infrared safety photoelectric, automatic closed-door system (time adjustable), double-sided geomagnetic.
11, construction machinery Angle grinder, pistol drill, powder package, screwdriver, hammer, line sinker, level ruler, ruler and so on.

Second, high speed door construction process:
1, process flow, hole handling, elastic line, fixed reel gear, no-load test, curtain board, installation guide rail cleaning.
2, operating process
(1) Opening treatment: Check whether the hole size matches the product size. The size of the opening of the quick shutter door is to determine the location of the hole in addition to the size of the hole.
(2) Stretching line: Measure the height of the opening and pop up the two guide rails vertically and the center line of the reel. Although the site has opened a doorway, the verticality still needs to be reviewed.
(3) Fixed reel and transmission device: The backing plate is welded on the embedded iron plate, the left and right brackets of the reel are fixed with screws, and the reel is installed. The drum should be flexible after installation. Install reducer and transmission system. Install the electrical control system.
(4) No-load trial run: Check whether the working conditions of the motor and reducer are normal after power-on, and whether the reel rotation direction is correct.
(5) Drapery: The panels are assembled and then installed on the drum.
(6) Mounting guide rail: According to the position specified on the drawings, the two sides and the upper guide rails are welded to the wall embedded parts and welded together, and each guide rail should be in the same vertical plane.
(7) Test run: Manually run the test, and then use the electric motor to open and close several times, adjust to the phenomenon of no jamming, blocking and abnormal noise, and the speed of opening and closing meets the requirements. After all the debugging is completed, install the protective cover.
(8) Cleaning: Painted or inlaid rail wall decorative surface, clean up the scene.

Third, security and civilized measures
1. The construction uses a mobile scaffold, and the scaffold needs to be qualified before it can be used;
2. The construction area is located in the production workshop. During the construction process, red and white ropes shall be used to set up security fences within three meters of the construction site. Casual people shall not enter, and at the same time, the splashing beyond the fence area shall be avoided;
3, construction workers to enter the workshop construction need to wear reflective vests;
4. If a hot work is completed outside the workshop as much as possible, it must be applied in advance in the workshop. In addition to preparing the fire extinguisher during the construction, there should be a safety officer next to the station;
5. The on-site construction electricity needs to be connected by the full-time electrician of the project department, and other personnel are prohibited to operate;
6. Safety belts must be worn correctly for work at height;
7. After the completion of the construction, the site shall be cleaned and retired in an orderly manner. After exiting the site, the production facilities, signs, etc. in the construction area shall be restored;
8, on-site construction should pay attention to product protection, to avoid scratching the floor, wall tiles and curtains

Previous: Baidu credit certification

Next: Company History

Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send