The installation steps of the high speed door
1. The relevant personnel who install the quick door must have experience in the installation before the installation, familiar with the design and installation drawings of the quick door, check whether the site is in place before installation, and do other preparatory work before installation, including the temporary need to be used. Parts, installation tools, etc.
2. Before installation, carefully check whether the size of the design drawing matches the size of the site opening; whether the number and appearance of the rail bracket are correct; whether the embedded part of the site is installed, and whether the position of the bracket is accurate or not.
3. The installation workflow is roughly divided into: on-site hole handling, positioning of the elastic line, fixed fast door reel transmission, no-load test, installation of the curtain, installation of fixed rails, testing of the fast door function, cleaning the scene.
4. Hole treatment: Check whether the size of the hole is consistent with the product size. Generally, the width and height of the hole at the site should not exceed 5m. If it is exceeded, it is recommended to install the stacking door to check whether the position and quantity of the embedded parts are correct.
5. On-site positioning of the elastic line: measuring the height of the installation hole, using the i